4.9 Stars | 200+ ReviewsGoogle
Fences · Decks · Gates
New raised deck off the back of a Portland-area home
★Free Estimates · 5-Year Warranty

Deck Building in Portland, OR & the Metro Area

  • New decks built to code
  • Composite or cedar
  • Price agreed before we start
Free
Written estimates
5-year
Workmanship warranty
4.9
Rating from 200+ reviews
Cedar or composite
Your choice of decking

What Our Customers Say

From the first visit to the final walk-through they kept us in the loop. The deck is solid, the railing is beautiful and we're out there every night.
Jen L.
New composite deck
They showed us photos of the rot under the deck before touching anything and only fixed what needed fixing. Fair and honest.
Luis G.
Deck repair
We can finally grill in the rain. The clear roof keeps the kitchen bright. Best money we've spent on the house.
Nate F.
Patio cover

Ready for an Outdoor Room That Works in Portland?

Signs it's time for a new deck

The back door opens onto a step and a patch of mud
A sloped yard leaves no flat place to sit
The old deck is soft, rotten or pulling off the house
You want room for a grill, table and chairs
A hot tub needs a solid, level platform
You're selling soon and the backyard needs a lift

What Deck Building Involves in Portland

New decks in cedar or composite, framed and flashed so rain runs off instead of soaking in. Ground-level, raised and multi-level decks across Portland, Tigard, Hillsboro and surrounding communities.

A deck is a raised wood or composite floor outside, built on footings, posts, beams and joists. Ground-level decks sit just above the soil and need no railing in most cases. Raised decks come off a second floor or a sloped lot and need beams, bracing and a guardrail. Good deck building starts with how you'll use the space: where the sun falls, where the grill goes and how you'll walk out of the house.

Portland's long wet season shapes how we build. The most common deck failure we see is rot where the deck attaches to the house, because water got behind a ledger board with no flashing. We flash that joint, space the ledger off the siding where needed, tape the tops of joists and leave gaps between boards so water drains and the frame dries out. Footings sit on firm soil below the topsoil so the deck doesn't sink or heave.

For the walking surface, cedar is the traditional local choice and composite is the low-upkeep one. The frame underneath is usually pressure-treated lumber rated for ground contact where it needs to be. Attached and raised decks usually need a building permit, and we handle the drawings and paperwork for the job. Every deck building project starts with a free written estimate.

Ground-Level vs Raised Deck

Ground-Level Deck

Best for
Flat yards and doors close to the ground
Railing
Often not needed
Watch for
Airflow under the frame so it dries out

Raised Deck

Best for
Sloped lots and upper-floor doors
Railing
Required guardrail and stairs
Watch for
Ledger flashing and beam sizing

How a New Deck Gets Built

1

Plan the space

Size, shape, stairs and materials chosen together

2

Written estimate

Framing, decking and railing spelled out

3

Drawings and paperwork

Plans prepared for your city when needed

4

Footings and frame

Footings, posts, beams, joists and flashing

5

Decking and railing

Boards, stairs and guardrail finished, site cleaned up

What Affects the Cost of a New Deck

No two decks are the same size or height. These are the things that decide the price of your deck building project.

  • Size and shape

    More square feet, angles and levels mean more framing and boards.

  • Height off the ground

    Raised decks need taller posts, bigger beams, bracing and railings.

  • Decking material

    Cedar, pressure-treated and composite boards all price differently.

  • Railing type

    Wood, aluminum, cable and glass railings range widely.

  • Stairs

    Each run of stairs adds stringers, treads and handrails.

  • Site and soil

    Slopes, tight access and wet or rocky soil change the footing work.

  • Old deck removal

    Tearing out and hauling away an old deck adds labor.

Every job gets a free written estimate before any work starts.

Why Portland Homeowners Call Your Business

Built for wet winters

Flashed ledgers and drained frames

Free written estimate

Full scope in writing before work begins

5-year workmanship warranty

On the decks we build

Licensed, bonded & insured

Covered on every job

Licensed, bonded & insured

Deck Building Questions

Should I build with cedar or composite?
Cedar is warmer, cheaper up front and easy to repair, but needs sealing every few years. Composite costs more up front and needs only washing. We show both at the estimate.
Does a new deck need a permit?
Many do, especially decks attached to the house or built off the ground. It depends on your city and the deck's height and size. We check and handle the paperwork for the job.
How long does it take to build a deck?
A simple ground-level deck can be done in days. A raised or multi-level deck takes longer, plus any time for plan review. The estimate gives you a timeline.
Can you build a deck for a hot tub?
Yes. A hot tub is very heavy when full, so the frame and footings under it are designed for that weight.
Can you build in the rainy season?
Yes. We build year-round, and the frame details we use are made for wet weather anyway. Heavy rain can shift a day here and there.

Get a Free Deck Building Estimate in Portland

Written estimate before any work begins.